Mar 28, 2024  
2014-2015 Undergraduate Catalog 
    
2014-2015 Undergraduate Catalog [ARCHIVED CATALOG]

CMGT 4200 - Construction Cost Control


3

P: Minimum grade of C (2.0) in CMGT 4100 ; minimum overall GPA of 2.0. Project-level cost control and construction economics. Emphasizes labor cost control, project cash flow, and analysis of capital expenditures. Other topics are order of magnitude estimating, equipment cost control, material cost control, subcontract cost control, and construction claims.