Dec 26, 2024  
2023-2024 Undergraduate Catalog 
    
2023-2024 Undergraduate Catalog [ARCHIVED CATALOG]

CMGT 4200 - Construction Scheduling and Cost Control


3

P: Minimum overall GPA of 2.0; CMGT 4100 . Project-level cost control and construction economics. Emphasizes labor cost control, project cash flow, and analysis of capital expenditures. Other topics are order of magnitude estimating, equipment cost control, material cost control, subcontract cost control, and construction claims.